NAVFAC awarded W4 Construction Group a $280,084.01 design-build contract with Great Lakes to construct new foundations and anchor rods for light poles, in addition to the removal of damaged stadium light poles and obsolete stadium metal halide light fixtures. The new light fixtures are highly efficient LED fixtures that are 60% more effective than the previous lights.

 

Client: NAVFAC
Contract Value: $280,084.01
Location: Great Lakes, IL
Contract Number: N4008520C0067
Award Date: September 2020