by grntrmd1800 | May 6, 2019
Back to Our Projects Zebra Mussel Cleaning at Water Intake Crib Project Description Inspect and clean existing water intake cribs of zebra mussels, marine deposits, and other found debris/contaminants to ensure proper design flow rates and an efficiently operating...
by grntrmd1800 | May 6, 2019
Back to Our Projects RFP Rooftop Solar Photovoltaic Hangar 1050 Project Description W4 Construction Group was awarded this $811,457 contract to design and build a roof mounted solar array. Allowing the military to meet their energy efficiency targets, reducing...
by grntrmd1800 | September 12, 2018
Back to Our Projects Swanton Upgrade Squad Ops & Intel Vaults Project Description Project included renovating the intel & operations vaults (SCIF) & provided upgrades to building systems at Building 118. Upgrades on intrusion detection system (IDS),...